KSS – CHULLORA | 2017
This new self-storage centre comprises of 3 self-storage buildings, a 4 storey, 2 storey and 1 storey.
The project presented major challenges with the site containing 11 easements, including for State Rail power lines, Sydney Water open channel (which was made into a culvert tunnelling it through the site) and Energy Australia high transmission lines. The site also had a council boundary through it requiring the DA to be submitted to two councils and was affected by flooding which needed to be dealt with in the design.